Hot Work/Open System Work

Working on open systems on operating pipelines in brownfield stations, terminal and pipeline ROWS.

 

Projects that we have worked on include the following:

    •  
    • Isolation and Lock-out & Tag-Out (LOTO)
    • De-oiling mainline pipelines
    • De-oiling station and terminal piping
    • Mainline cut-outs (removal and replacement of existing lines)
      • Pneumatic cold cuts
      • Stopple Jobs
        • Installing Stopple Tees
        • Hot Tapping mainline (in service pipeline from NPS 2 to NPS 48)
        • Installation and removal of completion plugs
      • Detailed scheduling/planning to minimize outage time
    • Station/Tank Piping cut-outs (removal and replacement of existing lines)
    • Existing and new valve Replacement
    • Storage Tank
    • Pump Installation (remove and replace)
    • Pigging Operations
      • Loading and Unloading Pigs (Cleaning tools, Inline Inspection, calipers tools)
      • Cleaning Tool runs for abandonment
      • Tool Tracking
PINNACLE ENERGY GROUP INC © 2015 - 2018 ALL RIGHTS RESERVED. | Theme: Business Kid by eVisionThemes